SolarStock USA
SolarStock USA
U.S. Solar Inventory
GA Warehouse · Southeast · GA 31021

Georgia Solar Panel Inventory.
IRA 45X Domestic Content. GA 31021.

IRA Section 45X Domestic Content solar modules stocked at our Dublin, GA 31021 warehouse — assembled at our Lyerly, GA manufacturing facility. Sunpro Power TOPCon bifacial solar modules with manufacturer attestation, BOM, and BoL provided. Freight from GA 31021.

1.19 MW
MW in stock
1.19 MW
Ready to ship
56
Ready pallets
Freight
from GA
1.19 MW
Total MW
1.19 MW
Ready now
56
Total pallets
1
SKUs
Confirmed operational locations

Georgia warehouse locations.

Dublin
45X
GA 31021
MW
48.52 MW
Pallets
2,224
Ready + incoming
Georgia inventory · live · updated every 60 seconds

Georgia pallet inventory.

All available SKUs at Georgia warehouse locations. Freight quoted separately. Container quantities and multi-MW pricing via RFQ.

1 lot · 1.190 MW ready · 1 lot · 47.330 MW inbound · D2C from manufacturer
Freight quoted separately
Live inventory Warehouse states GA
How many pallets?
Best volume price
TechWHPalletsPcs/plt$/Plt
SPDG590-N144M10🇺🇸 Domestic590TOPConGADublin1.1895636$0.3889$8,260
BUY NOW
Arriving — quoted, not sold from the shelf
SPDG590-N144M10🇺🇸 Domestic590TOPConGADublin47.3272,168ETA Nov 202637$0.3889$8,490
All prices in USD · Freight quoted separately upon RESERVE · Stock subject to prior sale · Pallet pricing above · Container 40HQ tier below · MW-scale allocations on RFQ
Container 40HQ tier
One full container · priced separately on RFQ
Modules ship loose, not palletized · quote on request
Container 40HQ
SPDG590-N144M10
USA-GA
DOMESTICIRA 45X
Modules · loose
720
Total kW
424.80
Pricing
Priced separately on RFQ
Request container quote →
Need more than one container?

Multi-container and MW-scale orders are quoted manually — volume, delivery window and freight optimized per project.

MW-scale project quote →
🇺🇸 IRA Section 45X · Assembled in Lyerly, GA · Stocked at GA 31021 (Dublin)

10% ITC bonus adder. Documentation included.

Domestic Content modules stocked at our Dublin, GA 31021 warehouse are assembled at our Lyerly, GA manufacturing facility — qualifying for IRA Section 45X treatment. Manufacturer attestation, BOM, and Bill of Lading provided with every shipment.

View IRA 45X details →
Procurement logistics

Freight from GA warehouse.
Direct from confirmed inventory.

Southeast distribution from our Dublin, GA warehouse. Stocks IRA Section 45X Domestic Content modules assembled at our Lyerly, GA manufacturing facility. Serving Southeast EPCs, developers, and national accounts.

Georgia is a major Southeast solar expansion corridor and IRA Domestic Content distribution hub. Our GA warehouse locations serve EPCs, commercial developers, C&I installers, and resellers across the Southeast and nationwide.

Locations
Dublin (GA 31021)
Shipping
Freight from GA warehouse
Readiness
Ready to ship + incoming
Ready shipment
3–5 business days after PO
MOQ
1 pallet (commercial) · Container (utility-scale)
Documentation
Commercial invoice · packing list · datasheet · certifications
Domestic Content
Assembled in Lyerly, GA · manufacturer attestation + BOM per shipment
Freight coordination
Available — contact logistics@solarstockusa.com
Direct procurement channel

Reserve Georgia allocation.

Reserve inventory at Dublin or request a quote for your commercial or utility-scale project. Freight quoted separately.

Shipping
Freight from U.S. warehouse
MOQ
1 pallet (commercial) · Container+ (utility)
Response time
Within 4 hours (business hours)
Georgia warehouse FAQ

Frequently asked questions

What solar panel wattages are currently in stock at the Georgia warehouse?

Current Georgia inventory spans multiple SKUs across 1 location: Dublin (GA 31021). All available wattages, quantities, and pricing are shown in real time above, updated every 60 seconds from our inventory system.

What are the Georgia warehouse locations?

Georgia inventory is held at the following confirmed locations: Dublin (GA 31021). Pricing is from each respective warehouse location. Contact our team to specify your preferred pickup or freight origin.

How quickly can orders ship from the Georgia warehouse?

Ready inventory ships within 3–5 business days after PO and deposit are confirmed. Buyer arranges freight pickup or we coordinate delivery through our preferred carrier network. Freight quoted separately.

What is the minimum order quantity for pallet purchases?

Minimum order is 1 pallet for commercial buyers. Container quantities (approximately 560–700 modules per 40ft HC, depending on SKU) are available for utility-scale projects via RFQ.

Do you provide freight coordination from U.S. warehouses?

Yes. Our U.S. operations team can coordinate freight from any of our U.S. warehouse locations to your project site or distribution center. Freight cost estimates are included in our RFQ response.

Are the Georgia modules IRA Section 45X Domestic Content eligible?

Yes. The Domestic Content modules stocked at our Dublin, GA 31021 warehouse are assembled at our Lyerly, GA manufacturing facility and qualify for IRA Section 45X Domestic Content treatment. We provide signed manufacturer attestation, component-level Bill of Materials, and per-lot Bill of Lading documentation for every Domestic Content shipment. The 10% ITC bonus adder requires meeting current Treasury Domestic Content percentage thresholds — our team provides full documentation support for project finance and tax counsel.

Can I reserve allocation at the Georgia warehouse for a future project?

Yes. We offer allocation reservation with a signed LOI or purchase order. Pricing locks are 15 days from PO. For larger projects (20+ MW), we structure staggered delivery schedules aligned with your construction drawdown.

More inventory options